Placer Gold Development in the Mount Hinton Region (Yukon)
Mayo Gold is advancing a placer gold project positioned within a historically productive district. Phase 1 is focused on access, stripping, test cuts, and scalable wash-plant production planning.
Project Overview
A practical, production-minded placer strategy: validate grade continuity with structured test cuts, optimize plant recovery, then scale throughput with disciplined capital allocation.
Why this district
Mount Hinton sits within a broader exploration district with extensive third‑party work and mapped structures.
Why placer, now
Rapid feedback loops: stripping → pay identification → recovery tuning → repeat. Phase 1 proves economics before scale.
What investors get
Defined claims, mapped context, a practical mining sequence, and near‑term production intent with clear milestones.
Claims & Targeting
Regional maps and overlays summarize sampling patterns and target clustering.



Phase 1 Plan — Near-Term Production Focus
Readiness → test cuts → commissioning → scale-up.
Site readiness & access
- Road/pad preparation
- Water management planning
- Equipment mobilization
Stripping & test cuts
- Targeted stripping
- Systematic test cuts
- Document recovery response
Wash plant commissioning
- Tune recovery
- Daily reconciliation
- Adjust for gold size distribution
Scale-up sequence
- Expand along consistent pay
- Optimize hauling/tailings
- Define Phase 2 targets


Downloads
Technical Report Resources.
Relevant Third-Party Links
Links are provided for regional context.
Strategic Metals
Trifecta Gold
Investor Contact
Request the investor package, timelines, and operational plan for Phase 1.
What we can share on request
- Phase 1 milestone chart
- Equipment list + capex/opex ranges
- Mining sequence map
- Weekly reporting template
Investor communications package